01 · Documented basis

Start outside the chip

The IEA’s 2026 review reports that global data-centre electricity demand grew 17% in 2025. That is historical context, not a forecast. Its discussion of rapidly changing AI loads also draws attention to the infrastructure needed to deliver reliable power.

IEA · Key Questions on Energy and AI · 2026 executive summary

02 · Documented basis

Follow the equipment

Eaton’s data-centre materials describe power-management systems, including UPS backup power and monitoring software. This puts an electrical-equipment supplier into the research picture. A product catalogue establishes what Eaton offers; it does not establish a sale to any particular AI project.

Eaton · Data-centre power systems · checked 29 September 2026

03 · Documented basis

Check the company’s record

In its fourth-quarter 2025 results, Eaton attributed a 16% rise in the twelve-month rolling average of Electrical Americas orders to data-centre momentum. This is an order measure reported by the company, not a 16% increase in AI revenue and not a return for shareholders.

Eaton · Fourth-quarter and full-year 2025 results